Api 5l SSAW Spiral Welded Steel Pipe

FOB Reference Price:Get Latest Price
$350.00 - $850.00 / Ton | 25 Ton/Tons (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Standard:
GB, GB/T 9711.1-1997
Grade:
10#-45#, Q195-Q345, 20#, Q235, Q345, Q195
Thickness:
6 - 25.4 mm
Section Shape:
Round
Outer Diameter:
21.3 - 406.4 mm
Place of Origin:
Tianjin, China
Application:
Fluid Pipe, transporting various of liquid and powdery solid
Technique:
SAW
Certification:
ce, ISO9001:2008
Surface Treatment:
Other
Special Pipe:
Other
Alloy Or Not:
Non-Alloy
Secondary Or Not:
Non-secondary
Shape:
screw, spiral
Section shape:
round
Main market:
southeast Asia, America, Canada, Europe, Middle East, Africa, etc
Factory:
yes
Appliocation:
transport for liquid, structural and engineering pipe
Packing:
Water-proof plastic cloth,Woven bags,Steel strips in bundles
Supply Ability
Supply Ability:
2000 Ton/Tons per Month Hot Rolled Technique HSAW/SSAW Pipe
Packaging & Delivery
Packaging Details
1.Packed in bundle,suitable for sea transport(by container)
2.According to the clients' requirements.
Port
Tianjin Port
Products Show
Our Company
Packing & Delivery

Packing:Plastic plugs in both ends with several steel strips, Two tags on each bundle, Wrapped in waterproof paper, PVC sleeve, and sackcloth with several steel strips, Plastic caps.

Delivery:within 20 days after receving the deposit or L/C.

Our Certifications
Customer Photo
FAQ


1.Where is your factory?

Our factory is located in Jinghai, Tianjin just 40 kilometers from Xingang port, which is the biggest port in the north of China.

2.What material do you have?

Q235B,Q345B,S235JR,S275JR,STK400/500

3.Can you provide sample for us?

Yes, free sample is available

4. How do you ensure quality control?

we ensure the quality control by 2 steps:

1)after finish, our workers will check it one by one.

2)our package department will check before they pack.

5.Which country is your main market now?

Mid-East, North Africa, West Africa, South-east Asia, South America and Northern Europe district. Especially, a firm customer base in Saudi, Morocco, Nigeria, India, Bangladesh, and Russia etc.

6. How about your delivery time ?

15-30 days for Pipe.